EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (677)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
-
Wing tips and flaps
-
Hardware
-
Hardware
-
Wing Mounting
-
Prep
-
Wing Root Fairing
-
Strut fairings
-
Strut fairings
-
Wingtips
-
Wingtips
-
Wingtips
-
Wingtips
-
AD-142 Fuel Tank...
-
Left Wingtip
-
Wing Removal
-
Mounting wings
-
Wing Attach
-
Left Wing Tip
-
Wing Struts
-
Wing Struts
-
Wing Struts
-
Flaps/Ailerons
-
Flaps/Ailerons
-
Flaps/Ailerons
-
Right wing build up
-
Right Wing Build-Up...
-
Right Wing Build-Up...
-
Right wing build up
-
Right Wing Build-Up
-
Right wing build up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right wing build up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right wing build up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Right Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Left Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing buildup
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Wing Build-Up
-
Spars
-
Spars
-
Wing Build-Up
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (3)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (51)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1990
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Sep 11, 2021
Right Wing Build-Up
- (2.5 hours)
Category: Wings
Completed riveting of top skin, gap seals and tank supports. Ready to flip and work on bottom skin.
Top Skin Completed (1).jpg
Top Skin Completed (2).jpg
Top Skin Completed (3).jpg
Top Skin Completed (4).jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.